Personal tools
You are here: Home Projects Lower Arroyo Mocho Improvement Project (R8-3)
Document Actions

Lower Arroyo Mocho Improvement Project (R8-3)

Contact Person
Web link
Lead Organizations
Investigators
Participating Organizations
Start Date
End Date
Progress proposed
Currentness
Location Description Arroyo Mocho, Arroyo de la Laguna, Hopyard Road

This project will remove sediment along 3,500 feet of Arroyo Mocho, from confluence with Arroyo de la Laguna to Hopyard Road to increase hydraulic capacity.  Build a new floodwall along Arroyo Mocho south of the maintenance road to protect Valley Trails from flooding.  Construct localized bio-technical bank slope stabilization measures and utilize grade control structures.  Conduct habitat enhancement through replacement of existing drop structures with fish passable structures, creating a low-flow channel, and planting of shaded riverine aquatic cover.

Remove sediment to curtail aggradation of Arroyo Mocho at confluence with Arroyo de la Laguna. Enhance in-stream aquatic habitat for steelhead.
Floodwall, Hydrology, Flood Protection, Bank Stabilization, Fish Passage, Channels, Habitat Enhancement, Geomorphic design principles, Sediment Removal
Environmental and habitat protection and improvement, Flood management, Water quality protection and improvement, Wetlands enhancement and creation
Flood Protection & Stormwater Management