Arroyo de la Laguna (ADLL) Improvement Project 2 (R10-2)
| Contact Person | |
|---|---|
| Web | link |
| Lead Organizations | |
| Investigators | |
| Participating Organizations | |
| Start Date | |
| End Date | |
| Progress | proposed |
| Currentness | |
| Location Description | Arroyo de la Laguna Stream |
This project will replace existing concrete storm water drainage outfall near Beaumont Court, downstream of Bernal Avenue with a new drain structure to prevent downstream erosion. This project will also remove the existing concrete structure located at the confluence of Line B21 and ADLL and replace it with a drop structure, concrete apron and riprap to act as an energy dissipation unit. The project also includes bank stabilzation utilizing bio-technical stabilization techniques and vegetated bank terrace. Lastly, this project will include installing recreational features, such as a multi-purpose trail and interpretive kiosks.