Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home Projects Archived Projects - 2013 Plan Update

Archived Projects - 2013 Plan Update

This folder contains projects that have been archived as part of the 2013 Plan Update. They were in the 2006 Plan, but will not be in the 2013 Plan.

 Title   Type 
Project Beaver Pond Habitat Enhancement Project at the Dow Wetland Preserve Project
Project Kirker Creek Watershed Greenway Park Plan Project
Project Kirker Creek Watershed Nursery Project
Project Colma Creek Flood Control and Habitat Mitigation Improvements Project
Project Creek Facility Inventory Project
Project Projects to Reduce and Control PCBs in Stormwater through TMDL Implementation Project
Project City of Fremont NPDES Stormwater Treatment Measures Evaluation Project
Project Vista Grande Watershed Plan Project
Project Watershed Habitat and Project Mapping Program Project
Project Thompson Creek Stream Stabilization Project
Project Upper Berryessa Creek Flood Protection Project Project
Project Upper Guadalupe River Project Early Implementation Reaches (Reach 6 and 12, downtown and north San Jose) Project
Project Upper Guadalupe River Project (Reach 12 - Branham Lane to Blossom Hill Road) Project
Project Upper Guadalupe River Project Reach 6, Highway 280 to Union Pacific RR Project
Project Upper Penitencia Creek Flood Protection Project Project
Project Urban Creek Trash Reduction Program Project
Project Sanchez / Terrace Creek Restoration Project Project
Project Sky Valley/Sulfur Springs Watershed Management Plan Project
Project Sonoma Valley Invasive Weed Control Project
Project South San Francisco Bay Shoreline Study: Alviso Ponds and Santa Clara County Project
Project State Lands Road and Trails Plan, Sonoma Creek Watershed Project
Project Steelhead Habitat Enhancement Project Project
Project Stevens Creek Restoration at Blackberry Farm, Cupertino (Reach C- greater than 1000 feet in length) Project
Project Storm Drain System Maintenance Equipment Project
Project Stormwater Pump Station Retrofit Project for the 21st Century Project
Project Streambank Stabilization Using Bio-engineering Project
Project Strentzel Meadow Enhancement Project
Project Sugarloaf Ridge State Park Erosion Control: Goodspeed Trail Rehabiltation Project
Project Sustainable Streets for Improved Stormwater Quality and Water Reuse Project
Project Pollutant Characterization of Colma Creek Project
Project Pond A8 Applied Study Project
Project Projects to Reduce and Control Copper in Stormwater Discharges Project
Project Protection from Tidal Flooding Project
Project Rain Gauge and Creek Level / Flow Monitoring (San Mateo) Project
Project Rain Gauge and Creek Level / Flow Monitoring (Burlingame) Project
Project San Francisquito Creek Flood Damage Reduction & Ecosystem Restoration Project Project
Project San Leandro Tributaries at South Hills Project
Project Rodeo Creek Watershed Plan Project
Project Rollingwood Neighborhood Creek Restoration Project Project
Project Regional BMPs, Field Manual, and Training for Stream Maintenance Activities Project
Project Rheem Creek Restoration and Watershed Council Project
Project Regional Biosolids Project Project
Project Regional Flood Agencies Forum Project
Project Richmond Bayshore Stewards Project
Project Robert Louis Stevenson State Park Erosion Control: Table Rock Trail Re-route Project
Project Watershed Monitoring & Assessment Program (WMAP) Project
Project Alameda County Partnership for Land Conservation and Stewardship Project
Project Alhambra Creek Restoration and Environmental Education Collaborative (ACREEC): John Swett Campus Project
Project Alhambra Valley Creek Coalition Restoration Project Project
Project Annadel State Park Erosion Control: Geary Ranch Road to Trail Conversion Project
Project CreekWise Project
Project CreekWise Creek Care Education Program for Creekside Property Owners Project
Project Cupid Row Canal of San Bruno Flood Control Channel Project
Project Bay Area Levee Certification Project
Project Benchmark Elevation System Project
Project Burlingame / Ralston Creek Restoration Project Project
Project Calabazas Creek, Miller Avenue to Wardell Road Project
Project Candlestick Point State Recreation Area Yosemite Slough Restoration Project Project
Project Capri Creek Channel Maintenance and Revegetation Project Project
Project Chimes Creek Watershed Rehabilitation Project
Project Codornices Creek, Kains to San Pablo Project
Project Community Stormwater Management - Sunnydale Watershed Project
Project Cordilleras Creek Restoration Project Project
Project Corona Road - Denman Reach Flood Wall Project
Project Corte Madera Creek Water Quality Monitoring Project
Project Corte Madera Creek Watershed Models Project
Project Corte Madera Creek Watershed Plan Project
Project Countywide Fish Passage Improvement Project
Project Coyote Creek-Lower Reach Maintenance Project Project
Project Defining Summer Low Flow Channels in Engineered Streams Project
Project Demonstrating Road Improvements in Napa Basin Project
Project Developing and Evaluating Options for Mitigating Risks of Public Health Impacts of Eating Fish Project
Project Development of Regional GIS for Watershed Planning Project
Project Easton Creek Restoration Project Project
Project EcoWise Certified Project
Project Fish Passage Improvements Project
Project Fish Passage Restoration Implementation Projects Project
Project Fisheries And Aquatic Habitat Collaborative Effort Project
Project Flood Prone Property Acquisition Study Project
Project Emergency Preparedness for Widespread and/or Tidal Flooding Project
Project Groundwater Recharge Opportunities for the Bay Area Project
Project Guadalupe River Adaptive Management Project
Project Guadalupe River Watershed Habitat Enhancement Project
Project Guadalupe Watershed Modeling Towards Mercury Management to Achieve TMDL Goals Project
Project Island Ponds Tidal Wetland Restoration Project
Project Jack London Lake Restoration and Sedimentation Reduction Project
Project Lake Merritt and Lake Merritt Channel Improvements Project
Project Ledgewood Creek Flood Management Project
Project Ledson Marsh Restoration: Annadel State Park Project
Project Line F-4 Concrete Lining (R9-2 ) Project
Project Line J-1, J-3, and J-5 Improvements (R9-3) Project
Project Lower Berryessa Creek Flood Protection Project Project
Project Lower Silver Creek Reaches 4-6 Project
Project Lower Walnut Creek Restoration Project
Project Lynch Creek Maintenance Project Project
Project Marin County Benthic Macroinvertebrate Sampling Program Project
Project Marin, Wilson, and Wiggins Creek Channel Maintenance and Revegetation Project Project
Project Mid Coyote Project
Project Mills Creek Restoration Project Project
Project Mount Diablo State Park: Comprehensive Stock Pond Evaluation and Sedimentation Remediation Project
Document Actions